My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-04_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2018-04-04_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 8:17:27 AM
Creation date
4/4/2018 10:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
4/4/2018
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
3/21/2018
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 21, 2018 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 9 <br /> <br />the spring when conditions allow. Pond J was almost dry at the time of the inspection. There was no discharge <br />from the pond. The discharge outlet was clear from debris and capable of functioning. The embankment of the <br />pond was well vegetated and stable. There were no indications of erosion. Pond K was dry during the inspection. <br />The embankments were well vegetated and stable. There were no observed blockages in the outlet and no <br />erosional features were noted. <br /> <br />Diversion ditches on Gob Pile 2 were generally in good condition. There was not any water flowing at the time of <br />the inspection. Two ditches one on Gob Pile 4 and one on Gob Pile 2 have had down-cutting in the channel occur. <br />Ditch D-D7 on Gob Pile 4 (Photo 3) has been down-cut and a Minor Revision (MR-196) has been approved to use <br />straw waddles to help reduce the flow velocity during precipitation and runoff events . D-D7 was stable and there <br />were no indications that the channel had been breached. Ditch D-F8 on Gob Pile 2 (Photo 4) has had similar <br />erosional down-cutting occur. A technical revision will be submitted to the Division to armor the channe l to <br />prevent future down-cutting from occurring. The ditch was stable and there were no observed signs that the <br />channel was being bypassed. <br /> <br />Ditches along the haul road were in good repair and capable of functioning as designed. There was not any flow <br />during the inspection. No erosional issues were observed. <br /> <br />For more details on the hydrologic balance of the facilities benches, please see the Support Facilities On -site <br />section of this report. <br /> <br /> <br /> <br /> <br />Photo 1: Pond F was holding water during the <br />inspection. There was no discharge.
The URL can be used to link to this page
Your browser does not support the video tag.