Laserfiche WebLink
the case, as surface facilities of an underground mine are considered to be surface coal <br />mining operations, therefore rendering Bowie No. 1 Mine subject to Rule 4.27. A <br />requirement for Bowie No. 1 Mine's compliance with Rule 4.27 was partially addressed in <br />Stipulation No. 43 of the Permit Renewal No. 2 decision. This stipulation was complied <br />with through the submittal and approval of Minor Revision No. 86. Technical Revision <br />No. 28 detailed the backfilling and grading reclamation requirements for the cut and fill <br />areas of the mine site. The cut and fill areas are to be restored to approximate original <br />contour except for a post -reclamation access road. The present haul road and access road <br />are to remain, although narrowed to a 16 foot width. The access road will be positioned <br />inside a 20 foot wide terrace corridor running the length of the road. <br />XXI. In Situ Processing - Rule 4.29 <br />This section is not applicable to the Bowie No. 1 Mine. <br />44 <br />