My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_GENERAL DOCUMENTS - C1981038
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2018-03-30_GENERAL DOCUMENTS - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:55:45 AM
Creation date
4/3/2018 1:01:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
3/30/2018
Doc Name Note
for (RN7)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Bowie Resources, LLC
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings of the Colorado Division of Reclamation, Mining and Safety <br />for the <br />Bowie No. 1 Mine <br />Explanation of Findings <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Board for <br />Coal Mining, and the approved state program, the Division of Reclamation, Mining and Safety or <br />the Board must make specific written findings prior to issuance of a permit, permit renewal or <br />permit revision. These findings are based on information made available to the Division that <br />demonstrates that the applicant will be able to operate in compliance with the Colorado Surface <br />Coal Mining Reclamation Act and the Regulations promulgated pursuant to the Act. <br />The findings in the following sections required by Rule 2.07.6(2) are listedin accordance with that <br />Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) are listed in <br />accordance with Rule 4 and are organized under subject or discipline subtitles. <br />This findings document is updatedupon permit renewal, which occurs every five years for most <br />mines. This is the renewal findings document for the Bowie No. 1 Mine, which has a five year <br />permit term. The following findings wore reevaluated and updated if necessary to reflect changes <br />Mich have occurred during the past permit term. Any stipulations from the original permit and <br />findings document or subsequent revisions that have been totally resolved to the satisfaction of the <br />Division, have been removed from this document. <br />Section A - Rule 2.07.6 <br />1. The permit application is accurate and complete. All requirements of the Act and these <br />rules have been complied with (2.07.6(2)(a)). <br />2. Based on information contained in the permit application and other information available <br />to the Division, the Division finds that surface coal mining and reclamation activities can <br />be feasibly accomplished at the Bowie No. 1 Mine (2.07.6(2)(b)). <br />3. The assessment of the probable cumulative impacts of all anticipated coal mining in the <br />general area on the hydrologic balance, as described in 2.05.6(3), has been made by the <br />Division. This assessment entitled "Cumulative Hydrologic Impacts of Mining to the <br />North Fork of the Gunnison River" is available for inspection at the offices ofthe Division. <br />The Division finds that the operations proposed under the application have been designed <br />to prevent damage to the hydrologic balance outside the proposedpermit area. Please refer <br />to Section B.III (Probable Hydrologic Consequences) of this document for additional <br />discussion of the predicted hydrologic consequences of mining operations at the Bowie <br />No. 1 Mine. (2.07.6(2)(c)). <br />4. The Division finds that the affected area is, subject to valid rights existing as of August 3, <br />1977, not within: <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.