My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_REVISION - C1981038 (12)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-03-30_REVISION - C1981038 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 4:06:08 PM
Creation date
3/30/2018 4:00:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/30/2018
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
RN7
Email Name
ccw
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper , Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />March 30, 2018 <br /> <br /> <br />Basil Bear <br />Bowie Resources, LLC <br />P.O. Box 1488 <br />Paonia, CO 81428 <br /> <br /> <br />Re: Proposed Decision <br /> Permit Renewal Application No. 7 (RN-7 ) <br /> Bowie No. 1 Mine (Permit No. C-1981-038) <br /> <br /> <br />Dear Mr. Bear: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision <br />Package for Permit Renewal No. 7 at the Bowie No. 1 Mine . Notice of the proposed decision <br />will be published in the Delta County Independent as soon as possible. The first publication <br />will initiate the thirty (30) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved <br />renewal materials were sent to the Office of Surface Mining and the Bureau of Land <br />Management. The materials should be sent within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision f orm. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond <br />or rider to your existing bond that equals or exceeds the Revised Liability. The permit will not <br />be issued until the Division has received and approved the bond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.