Laserfiche WebLink
The current bond of$32,303 will suffice for operations within Phase 1. Once the operator wishes <br /> to begin mining in Phase 2 areas, an additional $108,040 of bond will be required. This will lead <br /> to a total bond in Phase 2 of$140,343. <br /> Base Products Gravel Pit 41 <br /> February 2018 L-2 <br />