Laserfiche WebLink
; COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> D,2P,wrne,t c`Nacura:R_,ou;cis <br /> P:.;n,2r5 <br /> 6- -r,Cd_..... ,203 <br /> March 19, 2018 <br /> Kyle Kaltenbacher <br /> Transit Mix Concrete <br /> 324 W. Dale St. <br /> Colorado Springs, CO 80905 <br /> Re: Notice of Formal Board Hearing,Pre-hearing Conference, and Recommendation Date for a <br /> 112c Permit Application with Public Objections, Transit Mix Concrete Co.,Hitch Rack Ranch <br /> Quarry,File No.M-2017-049 <br /> Dear Party and/or Interested Person: <br /> The Division of Reclamation, Mining and Safety (Division) appreciates you taking time to participate in <br /> the review process of the above referenced permit application. The application for the Hitch Rack Ranch <br /> Quarry was filed with the Division on November 9, 2017 by Transit Mix Concrete Co. (Application). The <br /> review period for the Application will close on March 30, 2018. <br /> An explanation of the Division's review process, your rights as either a party or non-party, and the <br /> jurisdiction of the Mined Land Reclamation Board (Board) is provided in a 12-page memorandum, "Guide <br /> to Citizen Participation in the 112 Reclamation Permit Application Process for Construction Material and <br /> Hard Rock/Metal Mining Operations", dated October 2, 2001, revised January 12, 2006. This memo is <br /> available through the Division's website at wNy .mining.state.co,us, specifically at the following link: <br /> ,,tiww.minin�7.state.co.us/SiteCollectionDocunieilts/112processmemoFinal.pdf. As noted in the memo, in <br /> these proceedings, the Division's authority is limited to enforcement of the Colorado Land Reclamation <br /> Act for the Extraction of Construction Materials, 34-32.5-101, et seq., C.R.S. (Act) and the Mineral Rules <br /> and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of Construction <br /> Materials (Rules). A copy of the Construction Materials Act and Rules are available through the Division's <br /> website. <br /> The Division has received timely written objections to the Application. Therefore, pursuant to Rules <br /> 1.4.9(2)(a) and 1.7.4(2), the Division has scheduled the Application for a formal Board hearing for <br /> consideration. The hearing has been scheduled for the April 25-26,2018 Board meeting, which will occur <br /> at Hotel Elegante Conference and Event Center, 2886 S. Circle Dr., Colorado Springs, CO 80906 (in the <br /> Summit Ballroom), beginning at 9:00 a.m. or as soon thereafter as the matter can be considered. During the <br /> hearing, the Board will consider the Application with objections and may decide to approve, approve with <br /> conditions, or deny the Application. <br /> Pursuant to Rule 2.7, the Division has also scheduled a Pre-hearing Conference to occur on April 9, 2018 <br /> at the Centennial Hall Auditorium, 200 South Cascade Avenue, Colorado Springs, CO 80903, from 1:00 <br /> p.m. to 4:00 p.m. The Pre-hearing Conference will be held to describe the Division's review process, to <br /> explain the rights and responsibilities of parties, to discuss and resolve issues to the extent possible, to <br /> She n stt et, R;:,r, 21 , P:vt r, t0 St^tti P 3:3,56E 3,7 F,u3 632.b1(16 r,ttp. nr,uiu ;.sta'e cO.us <br /> n C', <br /> JJi,.�%'/ H0Eiliapt': r,Vd?:[, E­PCI'rv;?Dif,�'(a01 VI!QI;t',3 5'iiiti 7r1, LitcCioC <br /> at <br /> w'*1 <br /> A76�'' <br />