COLORADO
<br /> Division of Reclamation,
<br /> Mining and Safety
<br /> I 113 SR;t,r 11
<br /> March 19, 2018
<br /> Karen A. Turley
<br /> 2820 Par Three Heights
<br /> Colorado Springs, CO 80926
<br /> Re: Notice of Formal Board Hearing,Pre-hearing Conference, and Recommendation Date for a
<br /> 112c Permit Application with Public Objections, Transit Mix Concrete Co.,Hitch Rack Ranch
<br /> Quarry,File No. M-2017-049
<br /> Dear Party and/or Interested Person:
<br /> The Division of Reclamation, Mining and Safety (Division) appreciates you taking time to participate in
<br /> the review process of the above referenced permit application. The application for the Hitch Rack Ranch
<br /> Quarry was filed with the Division on November 9, 2017 by Transit Mix Concrete Co. (Application). The
<br /> review period for the Application will close on March 30, 2018.
<br /> An explanation of the Division's review process, your rights as either a party or non-party, and the
<br /> jurisdiction of the Mined Land Reclamation Board (Board) is provided in a 12-page memorandum, "Guide
<br /> to Citizen Participation in the H 2 Reclamation Permit Application Process for Construction Material and
<br /> Hard Rock/Metal Mining Operations", dated October 2, 2001, revised January 12, 2006. This memo is
<br /> available through the Division's website at www.minint.state.co.us, specifically at the following link:
<br /> x«Nw.niinin�-T.state.co.us/SiteCollectionDocuments/112processmemoFinal.pdf. As noted in the memo, in
<br /> these proceedings, the Division's authority is limited to enforcement of the Colorado Land Reclamation
<br /> Act for the Extraction of Construction Materials, 34-32.5-101, et seq., C.R.S. (Act) and the Mineral Rules
<br /> and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of Construction
<br /> Materials (Rules). A copy of the Construction Materials Act and Rules are available through the Division's
<br /> website.
<br /> The Division has received timely written objections to the Application. Therefore, pursuant to Rules
<br /> 1.4.9(2)(a) and 1.7.4(2), the Division has scheduled the Application for a formal Board hearing for
<br /> consideration. The hearing has been scheduled for the April 25-26,2018 Board meeting, which will occur
<br /> at Hotel Elegante Conference and Event Center, 2886 S. Circle Dr., Colorado Springs, CO 80906 (in the
<br /> Summit Ballroom), beginning at 9:00 a.m. or as soon thereafter as the matter can be considered. During the
<br /> hearing, the Board will consider the Application with objections and may decide to approve, approve with
<br /> conditions, or deny the Application.
<br /> Pursuant to Rule 2.7, the Division has also scheduled a Pre-hearing Conference to occur on April 9, 2018
<br /> at the Centennial Hall Auditorium, 200 South Cascade Avenue, Colorado Springs, CO 80903, from 1:00
<br /> p.m. to 4:00 p.m. The Pre-hearing Conference will be held to describe the Division's review process, to
<br /> explain the rights and responsibilities of parties, to discuss and resolve issues to the extent possible, to
<br /> describe the Board hearing processes, to propose a list of issues under the Board's jurisdiction, to simplify
<br /> OV ��Lr
<br /> 313 Shi iE1�1 >c1 tt. Pconr 215. D I},..., CGi11i' P 303 S �.35{,7 F �I.3 t{3Z.8'.
<br /> Gatierrtr � PoI �t 1�
<br /> 'J. Rswd,aH. Exo wi,,e D- cct_)r ! b,I;mia F, av, °. DI,0(tol I J"IIr ;Y. 11rr,I,:n,7�rer �
<br /> °iS76
<br />
|