Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Exhibit 13C - Cumulative Bond Schedule <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 3/13/2018 <br />User: ZTT <br />Permit Action: 13C (TR118) <br />State: Colorado <br />County: Moffat <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />029 <br />Remove Collom Haul Road and Facility Culverts <br />DEMOLISH <br />1 <br />1 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />24.00 <br />$82,002.45 <br />$251,335.01 <br />$13,478.00 <br />$420,641.00 <br />$970,437.00 <br />$906,975.00 <br />$60,608.00 <br />$169,345.00 <br />$13,456.00 <br />$33,186.00 <br />$54,822.00 <br />$53,388.00 <br />$130,395.00 <br />$64,115.00 <br />$991,339.00 <br />$1,346,324.00 <br />$6,095.00 <br />$2,239.00 <br />$3,657.00 <br />$5,508.00 <br />$10,487.00 <br />$28,860.00 <br />$2,136.00 <br />$7,141.00 <br />$779.00 <br />$1,413.00 <br />$804.00 <br />$575.00 <br />$1,417.00 <br />Demo Collom Facilities and Haul Road Crossing <br />DEMOLISH <br />60.00 <br />Rip 29,458' of Collom Haul Road <br />RIPPER <br />12.69 <br />Haul/Regrade Spoil to Collom Haul Road: 00+00 - <br />208+00 <br />SCRAPER1 <br />93.23 <br />Haul/Regrade Spoil to Collom Haul Road: 208+00 <br />-282+00 <br />SCRAPERI <br />215.09 <br />Haul/Regrade Spoil to Collom Haul Road: 282+00 <br />-395+00 <br />SCRAPER1 <br />204.35 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />112+26 - 149+00 <br />SCRAPERI <br />13.43 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />149+00 - 222+20 <br />SCRAPERI <br />37.53 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />222+20 - 242+00 <br />SCRAPERI <br />2.98 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />242+00 - 275+20 <br />SCRAPER1 <br />7.36 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />275+20 - 298+10 <br />SCRAPER1 <br />12.15 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />298+10 - 336+00 <br />SCRAPER1 <br />11.83 <br />Haul/Regrade Topsoil to Collom Haul Road: <br />336+00 - 396+89 <br />SCRAPER1 <br />28.90 <br />Reseed Collom Haul Road <br />REVEGE <br />116.35 <br />Regrade Collom Facility Area <br />DOZER <br />523.23 <br />Haul/Regrade Topsoil to Collom Facility from TS <br />25A <br />SCRAPER1 <br />298.40 <br />Section 25 Pond Removal <br />DOZER <br />13.49 <br />Middle Pond Removal <br />DOZER <br />4.95 <br />Section 36 Pond Removal <br />DOZER <br />8.09 <br />Section 26 Pond Removal <br />DOZER <br />12.19 <br />Sidehill Pond Removal <br />DOZER <br />23.21 <br />Coal Stockpile Pond Removal <br />DOZER <br />63.87 <br />Temporary Facilities Pond Removal <br />DOZER <br />4.73 <br />Wilson Storage Pond Removal <br />DOZER <br />15.80 <br />Regrade Ditch D1 <br />DOZER <br />1.72 <br />Regrade Ditch D2 <br />DOZER <br />3.13 <br />Regrade Ditch D3 <br />DOZER <br />1.78 <br />Regrade Ditch D4 <br />DOZER <br />1.27 <br />Regrade Ditch D5 <br />DOZER <br />3.14 <br />