My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-27_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-27_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 9:59:15 AM
Creation date
3/28/2018 12:05:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/27/2018
Doc Name
Adequacy Review Response
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR116
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1045.00 <br />2.00 <br />2.00 <br />4.00 <br />2394 <br />0.67 <br />Haul Time: 0.67 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(f m) <br />Travel Time <br />(min) <br />1 <br />1045.00 <br />-2.00 <br />2.00 <br />0.00 <br />2965 <br />0.46 <br />Return Time: <br />0.46 <br />minutes <br />Total Scraper team cycle time: <br />2.73 <br />minutes <br />Adjusted for job conditions: <br />1,058.02 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,058.02 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />4,232.09 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,274.73 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Total job time: 93.23 Hours <br />Unit cost: $1.066 /LCY Total job cost: $420,641 <br />
The URL can be used to link to this page
Your browser does not support the video tag.