Laserfiche WebLink
00 2 20 00 11 0 <br /> III0 00 <br /> t5 0q[Q <br /> If cc I5 00 C4 <br /> 3 <br /> y X/ C5 00 r 40 <br /> r I 00000l 80 00 <br /> "000, 746 <br /> 00 f 64 <br /> ' 90 <br /> 60 0 90 <br /> I90, <br /> 1,*'00 <br /> 0 00 10 <br /> I00 00 <br /> 00,7*,o <br /> 0 <br /> /o- 0 P I ................................................... -12 <br /> 47 00 ............................. 126 00... ........... III30 <br /> I2 4�S <br /> Ll 0 00 K <br /> 00 10 0'7900 1140- 00 <br /> ------ 20-00 ft, C/o <br /> L15 00 <br /> 5 U10 IIr 0 00 too I&O, <br /> 00/150 <br /> 30 00 150 <br /> 35 00 50. 00 IJOC I5 ..........o 16,10 I---�4b 00 II45 00 No-_U 16 ........40p�49 I00 <Io/I50 0 na sectlo 00 n 161 IT IL I60 00 fI80 -0-71 /70 00 L oop r -0-4 X-00-A ............... C C 80 Ir If L/100 00 Ile 30 90 -00 Or) ...........f __0 If r IA :7 Ic n 4?8 P a �j IIfo f S LEGEND POS G TOPOGRAPHY <br /> POSTMINING LAND -USE IS RANGELAND South Taylor Area <br /> PERMIT BOUNDARY 3: 14j_IIJ 36 31 32 33 ENGINEERS CERTIFICATION__r_ 34 35 36 7 10 11 -TTW-SN 1, LEE E. SAMPSON, hereby ce that this SCALE. 1 500' <br /> 12 rtify map has been reviewed by me and is true DATE: 5126106 <br /> 16 15 14 POST MINE CHANNEL =a 15 14 and correct to the best of my knowledge and DRWG. BY. TCpIESIi <br /> information, relying on information supplied A BY. <br /> 21 22 2 19 20 21 2 24 by experts employed by Co/owyo Coal COA _ PPROVED <br /> TERRACE DITCH 28 26 25 30 29 28 Company or qualified consultants working COMPAN 61i DRWG NO. <br /> 6 25 for Colowyo Coal Company, and that I am a ve�33 34 35 36 31 32 33 35 36 Professional Engineer licensed in Colorado as DISTURBANCE BOUNDARY _L4N re,-quired by the provisions of C.R.S. Colowyo Coal Company <br /> 4 3 2 1 T3N 12-25-1 01 through C.R.S. 12-25-1 1 9. IN 5731 State Highway 13 MAP 19B <br /> ST-A W I WITNESS WHEREOF, I have hereunder set Meeker,Colorado 81641 CROSS SECTION LINES SOUTH TAYLOR 9 10 1 1 1 8 9 10 1 12 my hand and affixed my seal. No. REVISION <br /> 16 15 14 13 17 16 5 4 13 DATE BY CHK <br /> 0. <br /> (SEE MAP 20B) Eo-23 24 r)o L TR New PMT 01 12, logo update, legend update <br /> 21 22 20 21 94 <br /> PMT contours affected in the East Pit area. 2114112 <br /> W40- TCP KRB <br /> 28 27 26 25 3 27 26 5 "<, - & 6 W - — <br /> CROSS SECTION LINES �4_�_-r�_ 1.0- <br /> 2 rn W <br /> 11 00 —_I 11 i O_ TR <br /> F (SEE MAP 20 AND 20A) 33 34 35 36 31 32 14 an ,0 = Added Affected Areas Proposed Under TR-1 03 <br /> 35 36 = -0 *. 17031 103 Updated Legend. 7131'1113 TONY JG <br /> T3N 7 500' 0 500' 1000, M C4 MW AFFECTED AREJAIS PR-04 Updated Permit Boundary <br /> % ONAL RECEIVED 315J15 TONY JG <br /> CONTOUR INTERVAL 25 FT.Note: Potentially affected areas are highwall mined areas under native lands based on a zero subsidence plan. TOPO PMT PR-04 Updated PMT Approved under TR-rj ? � 2017 1119115 TONY JG <br /> Areas within the Disturbance Boundary may not be disturbed but are permitted for disturbance in the future. ion, ___ <br /> TR-117 RevisedPMT Division ot Reclamat <br /> mining&Safety 1 1 0 7115 TON <br /> TR-117 <br /> Approved 1/31/18 RECEIVED <br /> 50 NOV 2 4 2017 <br /> Division of Reclamatiorl,. <br />