Laserfiche WebLink
October 19, 2017 <br />COLLOM PIT DEWATERING STUDY <br />TABLE OF CONTENTS <br />Page i <br />Paye <br />EXECUTIVE SUMMARY........................................................................................................ES-1 <br />1.0 INTRODUCTION................................................................................................................1 <br />1.1 Project Background and Setting...............................................................................1 <br />1.1.1 Project Location and Topography................................................................1 <br />1.1.2 Geologic Setting...........................................................................................1 <br />1.2 Collom Pit Mine Plan...............................................................................................2 <br />2.0 COLLOM PIT DEWATERING EVALUATION..............................................................4 <br />2.1 <br />Previous Dewatering Study......................................................................................4 <br />Pilot Test Pumping Schedule used in Calibration..........................................................9 <br />Table 3. <br />2.1.1 Collom Project Pre -feasibility Hydrology Report <br />.......................................4 <br />Regional Baseline Water Elevations............................................................................1 l <br />2.1.2 Collom Project Geotechnical Study Report.................................................4 <br />Well Locations, Depths, and Screened Lengths: Scenario 1 <br />......................................19 <br />2.1.3 Summary of AAI Review of Previous Studies...........................................4 <br />Well Locations, Depths, and Screened Lengths: Scenario 2 <br />2.2 <br />Collom Site Visit......................................................................................................5 <br />Water Discharge Pipeline Design Data: Scenario 1 ....................................................45 <br />2.3 <br />Dewatering Study Approach and Model Development...........................................5 <br />Table 9. <br />2.4 <br />Calibration of Strata Hydraulic Parameters.............................................................6 <br />Monitoring Well Locations and VWP Depths: Scenario 2 ..........................................46 <br />2.5 <br />Collom Pit Dewatering Predictive Analyses and Results......................................10 <br />2.6 <br />Water Discharge Pipeline Layout..........................................................................42 <br />2.7 <br />Monitoring Well Design........................................................................................46 <br />3.0 SUMMARY OF RESULTS AND RECOMMENDATIONS.............................................48 <br />4.0 REFERENCES..................................................................................................................49 <br />APPENDIX A ---SUMMARY OF MEASURED HYDRAULIC CONDUCTIVITIES ............................... A-1 <br />LIST OF TABLES <br />Page <br />Table 1. <br />Simulated Collom Area Layers......................................................................................8 <br />Table 2. <br />Pilot Test Pumping Schedule used in Calibration..........................................................9 <br />Table 3. <br />Summary of Calibrated Hydraulic Parameters..............................................................9 <br />Table 4. <br />Regional Baseline Water Elevations............................................................................1 l <br />Table 5. <br />Well Locations, Depths, and Screened Lengths: Scenario 1 <br />......................................19 <br />Table 6. <br />Well Locations, Depths, and Screened Lengths: Scenario 2 <br />......................................19 <br />Table 7. <br />Water Discharge Pipeline Design Data: Scenario 1 ....................................................45 <br />Table 8. <br />Water Discharge Pipeline Design Data: Scenario 2 ....................................................45 <br />Table 9. <br />Monitoring Well Locations and VWP Depths: Scenario 1 ..........................................46 <br />Table 10. <br />Monitoring Well Locations and VWP Depths: Scenario 2 ..........................................46 <br />Agapito Associates, Inc. <br />