My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_PERMIT FILE - C1981019
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-02-05_PERMIT FILE - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 5:16:08 PM
Creation date
3/27/2018 11:55:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
2/5/2018
Doc Name
Collom Pit Dewatering Study November 2017
Section_Exhibit Name
Exhibit 07 Item 22B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 19, 2017 <br />COLLOM PIT DEWATERING STUDY <br />TABLE OF CONTENTS <br />Page i <br />Paye <br />EXECUTIVE SUMMARY........................................................................................................ES-1 <br />1.0 INTRODUCTION................................................................................................................1 <br />1.1 Project Background and Setting...............................................................................1 <br />1.1.1 Project Location and Topography................................................................1 <br />1.1.2 Geologic Setting...........................................................................................1 <br />1.2 Collom Pit Mine Plan...............................................................................................2 <br />2.0 COLLOM PIT DEWATERING EVALUATION..............................................................4 <br />2.1 <br />Previous Dewatering Study......................................................................................4 <br />Pilot Test Pumping Schedule used in Calibration..........................................................9 <br />Table 3. <br />2.1.1 Collom Project Pre -feasibility Hydrology Report <br />.......................................4 <br />Regional Baseline Water Elevations............................................................................1 l <br />2.1.2 Collom Project Geotechnical Study Report.................................................4 <br />Well Locations, Depths, and Screened Lengths: Scenario 1 <br />......................................19 <br />2.1.3 Summary of AAI Review of Previous Studies...........................................4 <br />Well Locations, Depths, and Screened Lengths: Scenario 2 <br />2.2 <br />Collom Site Visit......................................................................................................5 <br />Water Discharge Pipeline Design Data: Scenario 1 ....................................................45 <br />2.3 <br />Dewatering Study Approach and Model Development...........................................5 <br />Table 9. <br />2.4 <br />Calibration of Strata Hydraulic Parameters.............................................................6 <br />Monitoring Well Locations and VWP Depths: Scenario 2 ..........................................46 <br />2.5 <br />Collom Pit Dewatering Predictive Analyses and Results......................................10 <br />2.6 <br />Water Discharge Pipeline Layout..........................................................................42 <br />2.7 <br />Monitoring Well Design........................................................................................46 <br />3.0 SUMMARY OF RESULTS AND RECOMMENDATIONS.............................................48 <br />4.0 REFERENCES..................................................................................................................49 <br />APPENDIX A ---SUMMARY OF MEASURED HYDRAULIC CONDUCTIVITIES ............................... A-1 <br />LIST OF TABLES <br />Page <br />Table 1. <br />Simulated Collom Area Layers......................................................................................8 <br />Table 2. <br />Pilot Test Pumping Schedule used in Calibration..........................................................9 <br />Table 3. <br />Summary of Calibrated Hydraulic Parameters..............................................................9 <br />Table 4. <br />Regional Baseline Water Elevations............................................................................1 l <br />Table 5. <br />Well Locations, Depths, and Screened Lengths: Scenario 1 <br />......................................19 <br />Table 6. <br />Well Locations, Depths, and Screened Lengths: Scenario 2 <br />......................................19 <br />Table 7. <br />Water Discharge Pipeline Design Data: Scenario 1 ....................................................45 <br />Table 8. <br />Water Discharge Pipeline Design Data: Scenario 2 ....................................................45 <br />Table 9. <br />Monitoring Well Locations and VWP Depths: Scenario 1 ..........................................46 <br />Table 10. <br />Monitoring Well Locations and VWP Depths: Scenario 2 ..........................................46 <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.