My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-27_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-03-27_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 7:04:03 AM
Creation date
3/27/2018 10:28:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/27/2018
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 173 of 394 <br />Han] Rnnte- <br />Seg # Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />N <br />(%) <br />(fpm) <br />Time <br />min <br />1 3700.00 <br />3.00 <br />3.00 <br />6.00 <br />1266 <br />3.098 <br />Haul Time: 3.098 <br />Return Route: <br />minutes <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) Time <br />min <br />1 <br />3700.00 <br />-3.00 <br />3.00 <br />0.00 <br />3503 1.260 <br />Return Time: <br />Total Truck Cycle Time: <br />1.260 minutes <br />7.776 minutes <br />Loading Tool unit <br />Production 4,730.51 LCY/Hour Adjusted for job efficiency: 3,926.32 LCY/Hour <br />Truck Unit Production <br />1,349.47 LCY/Hour Adjusted for job efficiency: 1,120.06 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 4,480.25 LCY/Hour <br />Adjusted single truck/loader team production: 3,926.32 LCY/Hour <br />Adjusted multiple truck/loader team production: 7,852.64 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.069 /LCY <br />Total job time: 103.95 Hours <br />Total job cost: $872,982 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.