My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-01-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:02:32 AM
Creation date
3/27/2018 9:32:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/31/2018
Doc Name
Permanent Channel Design
Section_Exhibit Name
Exhibit 07 Item 20 Part E -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 7, ITEM 20, PART E <br /> PERMANENT CHANNEL DESIGN <br /> There are two permanent primary channels and eight permanent secondary channels associated <br /> with the South Taylor Pit. The primary and secondary channels are permanent channels that <br /> convey runoff from the areas near the watershed divide near the southernmost extension of the <br /> mining activity. The primary channels are associated with drainage from the face of the West <br /> Taylor permanent fill. Their purpose is to convey water to the north from the head of the Taylor <br /> Creek watershed towards the West Taylor Sedimentation Pond as shown on Map 41A. The <br /> secondary channels drain reclaimed pit areas near the watershed divide in Sections 16, 20 and 21 <br /> to the southeast toward Section 16 Sedimentation Pond and Section 28 Sedimentation Pond. <br /> The secondary ditches rely on several temporary ditches to convey the runoff to the respective <br /> sedimentation ponds until reclamation is complete and the ponds are no longer needed. These <br /> temporary ditches are described in other exhibits. Two of these temporary ditches, described in <br /> Exhibit 7, Item 20, Part D are the Section 29 Collector Ditch and the Section 28 Collector Ditch. <br /> Another temporary ditch, the Section 16 Pond Ditch also receives flow from some of the <br /> secondary channels. It is described in Volume 2C, Exh 7-14B. The remaining temporary ditch <br /> that collects flow from the secondary channels described in this Part E is the Section Sixteen <br /> Pond Ditch Extension. This temporary ditch is described in Volume 2C, Exh. 7-140. <br /> All of these ditches are shown on Map 41A. Channel profiles for these channels are presented <br /> on Map 33B. Watershed details are also shown in Exhibit 7-20C. <br /> Primary Channels <br /> The two primary channels are the following: <br /> • West Taylor, East Tributary Ditch <br /> • West Taylor, West Tributary Ditch <br /> By inspection, the area contributory to each ditch is less than one square mile, making the <br /> appropriate design storm the 10 year, 24 hour event as specified in Rule 4.05.3. However, <br /> portions of these ditches pass over permanent fills, so the design event required by Rule 4.09.2 <br /> becomes the 100 year, 24 hour event. For simplicity of design, the entire channel for each ditch <br /> is designed to this larger event. <br /> Exhibit 7, Item 14 describes the hydrologic design methodology used in all models. For <br /> channels protected by a riprap liner, selection of minimum rip rap size is done using the <br /> Simons/OSM method in SEDCAD. For channels to be protected by a vegetative liner, the <br /> permissible velocities are also determined using SEDCAD's routines. <br /> The upper segments of the permanent primary channels are flat enough that a vegetative liner <br /> will provide sufficient erosion protection, even for the 100 year flow. However, both ditches <br /> below the stock ponds require riprap lining to ensure long-term stability. <br /> Each. 7-20E-1 Revision Date: 11/15/17 <br /> Revision No.: TR-117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.