My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-31_PERMIT FILE - C1981019A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-01-31_PERMIT FILE - C1981019A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 3:11:19 PM
Creation date
3/27/2018 9:32:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
1/31/2018
Doc Name
West Taylor Sedimentation Pond
Section_Exhibit Name
Exhibit 07 Item 20 Part C -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br />(`--ht 1 QQR -qn1 n P—i. I Crh—h <br />I <br />Structure #9 LPond1 <br />ETD -1 Stock Pond <br />Pond Inputs: <br />Pond Results: <br />Velocity and Manning's n calculations may not apply for this method. <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 101.10 ft <br />Dewater Time: 0.69 days <br />Dewatering time is calculated from peak stage to lowest sail/way <br />Elevation -Capacity -Discharge Table <br />Elevation <br />w/o Freeboard w/ Freeboard <br />Design Discharge: <br />62.47 cfs <br />Depth: <br />0.56 ft 2.56 ft <br />Top Width: <br />15.36 ft 27.36 ft <br />Velocity*: <br />0.050 <br />X -Section Area: <br />7.67 sq ft <br />Hydraulic Radius: <br />0.494 ft <br />Froude Number*: <br />0.000 <br />Manning's n*: <br />0.072 <br />Dmin: <br />2.00 in <br />D50: <br />6.00 in <br />Dmax: <br />7.50 in <br />Velocity and Manning's n calculations may not apply for this method. <br />Initial Pool Elev: 100.00 ft <br />Initial Pool: 2.01 ac -ft <br />Emergency Spillway <br />Spillway Elev Crest Length Left Right Bottom <br />(ft) Sideslope Sideslope Width (ft) <br />100.00 20.00 2.00:1 2.00:1 20.00 <br />Peak Elevation: 101.10 ft <br />Dewater Time: 0.69 days <br />Dewatering time is calculated from peak stage to lowest sail/way <br />Elevation -Capacity -Discharge Table <br />Elevation <br />Area <br />(ac) <br />Capacity <br />(ac -ft) <br />Discharge Dewater <br />Time <br />(cfs) (hrs) <br />90.00 <br />0.050 <br />0.000 <br />0.000 <br />90.10 <br />0.050 <br />0.005 <br />0.000 <br />90.50 <br />0.060 <br />0.027 <br />0.000 <br />91.00 <br />0.072 <br />0.060 <br />0.000 <br />91.50 <br />0.084 <br />0.099 <br />0.000 <br />92.00 <br />0.098 <br />0.144 <br />0.000 <br />Filename: TR -117 Post Mining 25 YR 24 HR.sc4 Printed 11-10-2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.