Laserfiche WebLink
The Division has removed Topsoil Pile 36A from the Exhibit 13C reclamation cost estimate. PIease <br />see the attached updated Exhibit 13C reclamation cost estimate <br />9. Division: On proposed page 13 of Exhibit 13C, discussion states that the provided information is <br />through the end ofyear 2020. Similarly to Item 8 ofthis letter, the Division will be bondingfor all <br />disturbances associated with current disturbances as well as hip to the currentpermit terns (years <br />2017 - 2021) with pending Renewal No. 7. The Division feels that the differing dates can lead to <br />confusion with the reclamation cost estimate with no defining disturbance limits associated with <br />2020 within fire Colowyo PAP. Please provide defining disturbance limits for the disturbances <br />associated with the proposed activities within Exhibit 13C. <br />Colowyo: Per phone discussion between Mr. Torry Tennyson and Mr. Zach Tr7 jillo in regards to this <br />comment a ntap (Map 13C-1) has been prepared and included in Exhibit 13C to identify the areas <br />planned for disturbance tinder Exhibit 13C The Division should note that this area will be smaller <br />distw Bance footer int that is contained oil Map 35B in RN -07. Colotivyo fidly understands the areas <br />shown on this map and contained in Exhibit 13C will be the lindting factor ofdisturbance Bance allowed <br />until Exhibit 13C is updated or Colowyo's post thefill bond amount required for the permit term. <br />The Division has reviewed the proposed Map 13C-1, Sheet 1 and Sheet 2 and have no comments. <br />Item is resolved. <br />10. Item is resolved. <br />11. Division: The Division las corrected its internal network issues and has calculated an updated Exhibit <br />13C - Cumulative Bard Schedule as well as the reclamation cost estimate (RCE) liability increase <br />associated with the changes proposed with TR -118. Attached are both documents. It should be noted <br />that the total anrotint associated with the Exhibit 13C is merely an update to include all items proposed <br />with the Cumulative Bond Schedule and not the RCE liability increase associated with the changes <br />proposed with TR -118. The majority oftasks associated with the Cumulative Bond Schedule have been <br />previously approved through the Division's revisions process or accounted for in the approved <br />Colowyo Exhibit 13A - Reclamation Cost Estimate last updated with Midtermn No. 7. The total vahue <br />of this proposed TR -118 RCE liability increase is $820,776.56 (see attached cost estimate). The <br />Division's cost estimate is consistent with previous cost estimates approved by both the Division and <br />Colowyo. Tire Division respecyttully requests a response fi-onh Colowyo with any questions regarding <br />the cost estimate or an acceptance of the Divisions estimate. <br />Colowyo: Colowyo has included two version of the sunhnumy sheets for the TR -118 and Exhibit 13C <br />BCE's for the Division. These sheets are not intended to become part of the PAP, but rather a clear <br />