My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-26_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 8:42:37 AM
Creation date
3/27/2018 7:31:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/26/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: 1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: 0.830 <br />NA <br />CAT HB <br />Net Correction: 0.830 I NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced watered, maintained 2,0 <br />Han l Rcnrte <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />001n) <br />Travel Time <br />(nun) <br />1 <br />1150.00 <br />-4.50 <br />2.00 <br />-2.50 <br />2972 <br />0.45 <br />HaulTime: 0.45 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(nun) <br />1 <br />1150.00 <br />4.50 <br />2.00 <br />6.50 <br />2638 <br />0.63 <br />Return Time: 0.63 minutes <br />Total Scraper teamcycle time: 2.68 minutes <br />Adjustedforjob conditions: 1,077.76 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: 1,077.76 LCY/Hour <br />Adjustedmultiplescraper team (fleet)hourly production: 4,311.04 LCY/Hour <br />Unadjustedunit production/hour: 1,298.51 LCY/Hour <br />Optimal Number of Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 <br />Team(s) Total job time: <br />7.36 Hours <br />Unit cost: $1.047 /LCY Totaljobcost: $33,186 <br />
The URL can be used to link to this page
Your browser does not support the video tag.