Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Haul/RegradeTopsoil toCollomHaul Road- 222+20-242+00 <br />Site: Colowyo Coal Mne Permit Action: 13C (TRI 18) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 009 State <br />Date: 3/13/2018 County <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT <br />Colorado <br />Moffat <br />DRM S <br />Des <br />Abbreviation: None <br />Filename: C019-009 <br />COSTShiftbasis: 1 per day <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: CatDllT - 11U <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker. 5.000 Gal. <br />CostRreakdown: Scraner Work Team SunnortFouinment MaintenanceFaninment <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 12,224 CCY Swell factor: 1.215 <br />Loose volume: 14,852 LCY <br />Source ofestimatedvolume: Table 7 Fes. 13B -T-20 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />WaterTruck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />75 <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />$226.13 <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />$137.93 <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />$405.90 <br />$115.79 <br />$32.54 <br />Numberof Units: <br />8 <br />0 <br />0 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$1,623.60 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 12,224 CCY Swell factor: 1.215 <br />Loose volume: 14,852 LCY <br />Source ofestimatedvolume: Table 7 Fes. 13B -T-20 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Materialweight: <br />1,600 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />AverageVolume: <br />29.00 <br />LCY <br />Payload Capacity: <br />51.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />