My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-26_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 8:42:37 AM
Creation date
3/27/2018 7:31:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/26/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Haul/RegradeTopsoil to CollomHaul Road. 149+00-222+20 <br />Site: Colowyo Coal Mne Permit Action: 13C (TRI 18) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 008 State: Colorado <br />Date: 3/13/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />I:[111J,;r1•/Opl1JIwoIDaA <br />Abbreviation: None <br />Filename: C019-008 <br />COSTShiftbasis: 1 per day <br />Equipment Description <br />-Scraper: I Cat 637G w/ ush- ull <br />-Dozer: I NA <br />Area: I CatDllT - 11U <br />—IVIVL,I <br />-Water Truck: 1 Water <br />Cost Breakdown: ScranerWorkTeam SunnortEauinment Maintenance Eauinment <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL OUANTITIES <br />Initial volume: 92,225 CCY Swell factor: 1.215 <br />Loose volume: 112,053 LCY <br />Source ofestimatedvolume: Table 7 Exm. 13B -T-20 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />75 <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />$226.13 <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />$137.93 <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />$405.90 <br />$115.79 <br />$32.54 <br />Numberof Units: <br />8 <br />0 <br />0 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$1,623.60 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour: $4,511.85 <br />MATERIAL OUANTITIES <br />Initial volume: 92,225 CCY Swell factor: 1.215 <br />Loose volume: 112,053 LCY <br />Source ofestimatedvolume: Table 7 Exm. 13B -T-20 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume,) Basis: <br />Materialweight: <br />1,600 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />51.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.