Laserfiche WebLink
286455 12/13/2017 02:57 PM 8: 943 P: 308 LOC CT <br />Page 18 of 25 R $133,25 D $0.00 T $133.25 Clear Creek <br />1111 U KNWIMPKI A), Mh 11111 <br />16) Please provide an estimate of the actual costs to reclaim the site based on what it would <br />cost the State of Colorado using an independent contractor to complete reclamation. The <br />Office adds up to an additional maximum eighteen and one half (18.5%) percent of that <br />total, which includes a private contract, typical overhead costs and profit. <br />Direct Cost: <br />i. Backfilling: <br />SO <br />(cubic yards) X $ /D <br />(cost per yard) = Total $ Soa <br />ii. Grading: <br />SO <br />(cubic yards) X $ /0 <br />(cost per yard) = Total $ S'00 <br />iii. Topsoil: <br />/a <br />(cubic yards) X $ ao <br />(cost per yard) = Total $ 200 <br />iv. Seeding: <br />IV <br />(acres) X $ l00 <br />(cost per acre) = Total $ 00 <br />v. Mobilization: I (Pieces of equipment) X $ S00 (cost per equipment) <br />Total $ SOD <br />D <br />Direct Cost Subtotal: $ 2.100 <br />Division's total overhead cost: X 18.5% <br />Division's Total cost: $ —?w8K, SO <br />Note: Based on the Division's experience the required financial warranty is normally set at <br />approximately $2,500 per acre. Therefore, a typical 5 acre permit will have a total required financial <br />warranty in the amount of $12,500. <br />