Laserfiche WebLink
Preliminary ADQ for Trapper TR 119 <br />March 2018 DRMS <br />1. For each topsoil stripping area, (haul road, N Pit and L Pit), please describe how stripped topsoil will be <br />handled and where it will be stored or deposited. <br />2. Please describe and or illustrate where and how runofffrom NPit will be routed. <br />3. Please demonstrate through SEDCAD or other means, the capacity of specified sediment ponds to treat <br />the runoff expected from NPit stripped area. <br />4. Please provide the acreage of the Haul road expected to be located in the Federal lease. <br />5. Please update the submitted revised page 3-16 regarding the sections L Pit Mining and Nighthawk Pit <br />mining, such that there is no supposition that a request for mining is either being requested or approved <br />with this TR. <br />6. Please indicate if you anticipate requiring a 200 foot buffer past the lease boundary on the 2018 east <br />stripping line at L pit. <br />Trapper Mine Technical Revision TR119 Prepared by: R. Reilley <br />Date: March 2018 <br />