My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-22_PERMIT FILE - P2018004
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2018004
>
2018-03-22_PERMIT FILE - P2018004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2021 7:30:43 AM
Creation date
3/22/2018 12:15:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2018004
IBM Index Class Name
PERMIT FILE
Doc Date
3/22/2018
Doc Name
Application
From
John Icabone
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings, ponds, etc. <br /> The property was mined during the 1930's. It consists of— 50 acres of wash rock tailings <br /> and overburden soil piles which are on the surface. I will also dig — 8 feet below the <br /> surfar--e- to gatheF samples of a Geur6e gravel layer F86tiRg OR Glay or bedrGGk. A !go yard <br /> bulk sample will be tested at 6 locations. The test gravels will be washed in a mobile <br /> trommel to determine the gold amounts. I he water ta a is less than 5 teeta ow e <br /> surface_ A nealiaible amount of around water will be used for the trammel then <br /> immediately returned to the pit where the water originated. Water pits will be backfilled <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> N/A <br /> Form 2—Public File Page 6 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.