Demo Worksheet Cont'd Task # TTT Page 80 of 143 <br />Task description: <br />Site: Kine Coal Mine <br />TRUCK/LOADER TEAM W <br />King II - Haul coal waste rock to King I waste pile <br />Permit Action: RN7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 300 State: Colorado <br />Date: 5/8/2017 County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team -Truck: Generic 12-18 cy, 6x4 <br />-Loader: OBSOLETE - CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: OBSOLETE - CAT 938H <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C035-300 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort F,ouinment Maintenance F.ouinment <br />Total work team cost/hour: $293.27 <br />MATERIAL QUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft high <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$22.16 <br />$25.66 <br />NA <br />$25.66 <br />NA <br />NA <br />Operating cost/hour: <br />$42.40 <br />$32.31 <br />NA <br />$32.31 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$30.37 <br />$41.20 <br />NA <br />$41.20 <br />NA <br />NA <br />Unit Subtotals: <br />$94.93 <br />$99.17 <br />NA <br />$99.17 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $194.10 <br />Support: $99.17 <br />Maint: $0.00 <br />Total work team cost/hour: $293.27 <br />MATERIAL QUANTITIES <br />Initial volume: 37 CCY Swell factor: 1.000 <br />Loose volume: 37 LCY <br />Source of estimated volume: Assume 100 sf x 10 ft high <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />