Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 57 of 143 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$9,817.50 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$233.03 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 0.50 0.50 <br />Return Time (Hours): 0.50 0.50 <br />Loading Time (Hours): 2.00 NA <br />Unloading Time (Hours): 1.00 NA <br />Subtotals: 4.00 1.00 <br />JOB TIME AND COST <br />Total job time: 8.00 Hours <br />Total job cost: $10,051 <br />CIRCES Cost Estimating Software <br />