My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-08_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2018-03-08_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 9:42:40 AM
Creation date
3/22/2018 11:22:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/8/2018
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Page 57 of 143 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$9,817.50 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$233.03 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): 0.50 0.50 <br />Return Time (Hours): 0.50 0.50 <br />Loading Time (Hours): 2.00 NA <br />Unloading Time (Hours): 1.00 NA <br />Subtotals: 4.00 1.00 <br />JOB TIME AND COST <br />Total job time: 8.00 Hours <br />Total job cost: $10,051 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.