Laserfiche WebLink
Demo Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />Haul Rnute- <br />Task # TTT Page 40 of 143 <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res Velocity <br />(%) (fpm) <br />Travel <br />Time <br />min <br />1 <br />200.00 <br />0.00 <br />5.00 <br />5.00 2218 <br />0.158 <br />Haul Time: 0.158 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />269.47 <br />LCY/Hour Adjusted for job efficiency: <br />223.66 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />200.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.097 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.097 <br />minutes <br />Total Truck Cycle Time: 2.540 <br />minutes <br />Loading Tool unit <br />Production <br />494.19 <br />LCY/Hour Adjusted for job efficiency: <br />410.18 LCY/Hour <br />Truck Unit Production <br />269.47 <br />LCY/Hour Adjusted for job efficiency: <br />223.66 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 447.32 <br />LCY/Hour <br />Adjusted single truck/loader team production: 410.18 <br />LCY/Hour <br />Adjusted multiple track/loader team production: 410.18 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 3.03 <br />Hours <br />Unit cost: <br />$0.526 <br />/LCY Total job cost: $655 <br />CIRCES Cost Estimating Software <br />