Laserfiche WebLink
March 13, 2018 C-2010-089/New Horizon North Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 5 of 6 <br /> <br /> Photo 5 – Sign in Meehan Draw Photo 6 – Topsoil Ring Ditch <br /> Photo 7 – Progresso Topsoil Pile Photo 8 – Topsoil Depth Verification, TS13 <br /> <br />