My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_PERMIT FILE - C1992081A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2018-02-05_PERMIT FILE - C1992081A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:07:12 PM
Creation date
3/22/2018 7:24:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
2/5/2018
Section_Exhibit Name
Tab 01 Permit Summary
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conjunction with the Mid -Term Permit Review, the CDRMS recalculated the remaining <br />reclamation liability, which was found to be less than the surety bond currently in-place. <br />Based on the reduced liability, HGTI filed a Surety Reduction Request, and a reduction in the <br />bond to $1,107,241 was approved onMarch 29, 2017 <br />Since CDMGs approval of the original permit application (Permit C-92-081) in May 1993, <br />Hayden Gulch has submitted several technical revisions (TR), minor revisions (MR), permit <br />renewals (RN) and a bond release (SL). A brief summary of the revisions follows. <br />TR -01 Responses to Stipulations 2 and 3 attached to Permit C-92-081. The TR <br />was submitted July 22, 1993 and the proposed decision to approve was <br />issued on Apri127, 1994. <br />MR -01 Change of Operator and Update TAB 3, Adjudication File. The MR was <br />submitted July 25, 1994 and the proposed decision to approve was issued <br />on August 22, 1994. <br />MR -02 Removal of RRC -15 from permit. The MR was submitted February 27, <br />1995 and the proposed decision to approve was issued on March 6, 1995. <br />MR -03 Ownership and Control Update. The MR was submitted November 7, 1995 <br />and the proposed decision to approve was issued on December 11, 1995. <br />TR -02 Responses to 1995 Midterm Issues. The TR was submitted January 31, <br />1996 and the decision to approve was issued on December 19, 1996. <br />MR -04 Submittal of Midterm Bond Increase. The MR was submitted and the <br />decision to approve was issued on April 5, 1996. <br />MR -05 Update of Operator, Ownership and Control Infomlation. The MR was submitted <br />July 31, 1996 and the proposed decision to approve was issued on September 10, <br />1996. <br />MR -06 Revise Legal Description. The MR was submitted August 12, 1996 and the <br />decision to approve was issued on August 30, 1996. <br />MR -07 Add Culvert RRC -15 to Permit. The MR was submitted May 23, 1997 and the <br />decision to approve was issued on May 23, 1997 <br />TR -03 Rail Loop Pond Storage Capacity Demonstration. The TR was submitted on <br />November 3, 1997 and the decision to approve was issued on February 19, 1998. <br />RN -01 Permit Renewal 01. The RN was submitted on November 3, 1997 and <br />the decision to approve was issued on June 2, 1998. <br />MR -08 Update Culvert Table and Map. The MR was submitted on June 18, 1997 <br />and decision to approve was issued on July 31, 1997. <br />RN17-05 1-6 Revised 11/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.