Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 002 Page 3 of <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />HaulRoute: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # HaulDistance <br />Grade (%) Roll. Res Total Res <br />Velocity <br />(Ft) <br />N N <br />(fpm) <br />T <br />;o7.14;02 <br />(Ft) <br />N <br />N <br />1 1200.00 <br />-8.00 5.00 -3.00 <br />3512 <br />HaulTime: 0.402 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />N <br />N <br />(fpm) <br />Time <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 804.13 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 800.36 <br />mm <br />1 <br />1200.00 <br />8.00 <br />5.00 <br />13.00 <br />1362 <br />0.925 <br />Return Time: 0.925 minutes <br />Total Truck Cycle Time: 4.877 minutes <br />Loading Toolunit <br />Production <br />964.29 LEY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />484.42 LCY/Hour Adjustedforjobefficiency: <br />402.07 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 804.13 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader teamproduction: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.613 /LCY <br />Totaljobtime: 4.84 Hours <br />Totaljob cost: $6,242 <br />CIRCES Cost Estimating Software <br />