Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 017 Page 1 of <br />BULLDOZER WORK <br />Taskdescription: ReplaceTops oil from Ups lope Area to W4 <br />Site: "rencitoCanyon Nfine Permit Action: RN4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task#: 017 <br />Date: 8/16/2017 <br />User: CCW <br />State: Colorado <br />County: Las Animas <br />Agency ororganizationname <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripperown. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C084-017 <br />$100.59 <br />Utilization % <br />NA <br />$87.23 <br />100 <br />$10.94 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $240.61 <br />Total Fleet Cost/Hour: $481.21 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,090 <br />Swell factor: 1.250 <br />L.00sevolume: 1,363 LCY <br />Source ofestimatedvolume: Table 2.05.4-1f <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjustedhourly <br />production: <br />125 feet <br />1,055.6 LCY/hr <br />Materials consistency description: Cons olidated stockpile 1.0 <br />Averagepush <br />0% <br />gradient: <br />Averages ite altitude: <br />7,100 feet <br />Material weight: <br />2,550 lbs /LCY <br />Weight description: <br />Earth - Dry packed <br />Job Condition Correction Factor Source <br />