My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_PERMIT FILE - C1996084 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2018-01-11_PERMIT FILE - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:13:16 AM
Creation date
3/22/2018 7:06:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
1/11/2018
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Grade Borrow Area 3 <br />Site: LorencitoCanyon Mne Permit Action: RN4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task#: 001 State: Colorado <br />1.50 <br />Abbreviation: <br />None <br />Date: 8/16/2017 County: Las Animas <br />Selected Blade Angle: <br />Filename: <br />C084-001 <br />User: CCW <br />9.90 <br />feet <br />Width ofblade overlap perpass: <br />Agency or organization name: DRMS <br />feet <br />Net grading orripping width perpass: <br />7.90 <br />feet <br />Unadjusted Hourly Unit Production: <br />HOURLY EQUIPMENT COST <br />acres/hour <br />Job Condition Correction Factors <br />Basic Machine: CAT 14M <br />Site Altitude: 7100 feet <br />Horsepower: <br />259 <br />Ripper Attachment: Multi-ShankRipper <br />Altitude Adj: 1.00 <br />Shift Basis: 1 <br />per day <br />Job Efficiency: 0.85 <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />Utilization % <br />acres/Hour <br />Ownership Cost/flour: <br />$54.68 <br />NA <br />Operating Cost/Hour: <br />$46.99 <br />100 <br />RipperOwnership Cost/Hour: <br />$3.74 <br />NA <br />Ripper Operating CosbHour: <br />$0.00 <br />0 <br />Operator CosdHour: <br />$28.90 <br />NA <br />Total Unit Cos t/Hour: <br />$134.31 <br />TotalFleetCost/Hour: $134.31 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source ofestimated acreage <br />HOURLY PRODUCTION <br />2.70 <br />Table 2.05.4-1f <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />45 <br />degrees <br />Effective Blade Length: <br />9.90 <br />feet <br />Width ofblade overlap perpass: <br />2.00 <br />feet <br />Net grading orripping width perpass: <br />7.90 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.4364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 7100 feet <br />Source <br />Altitude Adj: 1.00 <br />CAT HB <br />Job Efficiency: 0.85 <br />(lsh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.2209 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.2209 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Totaljobtime: 2.21 Hours <br />Unit cost: $110.01 peracre Totaljobcost: $297 <br />CIRC ES Cost Eshmatmg Solware <br />
The URL can be used to link to this page
Your browser does not support the video tag.