Laserfiche WebLink
Page 1 of <br />TRUCK/LOADER TEAM WORK <br />Taskdescription: Replace Topsoil from StockpileBA#3toW-3 <br />Site: LorencitoCanyon Mne Permit Action: RN4 Penn it/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task#: 011 State: Colorado <br />Date: 8/16/2017 County: Las Animas <br />User: CCW <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Description <br />IrucxL.oaaer Tearn -irucx: Lac //m, <br />-Loader: CAT 990H high lift <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dunn Area: Cat D9T - 9SU <br />-Water Truck: I Water <br />Abbreviation: None <br />Filename: C084-011 <br />Shift basis: l perdav <br />CostBreakdown: Truck/LoaderTeam SunnortEauinment MaintenanceEauinment <br />Total work team cost/hour: $1,285.00 <br />MATERIAL OUANTITIES <br />Initial volume: 1,830 CCY <br />Loosevolume: 2,059 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />TotalCost: $0.00 <br />HOURLY PRODUCTION <br />Swell factor: 1.125 <br />Truck Capacity: <br />TruckPavload (weight) Basis: <br />Material weight: 2,550 Pounds/L.CY <br />Description: Earth - Dry packed <br />Rated Payload: 122,520 Pounds <br />CntCES Cost Estimating Solware <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />WaterTruck <br />%Utilization -machine: <br />100 <br />90 <br />50 <br />100 <br />25 <br />25 <br />Ownershipcost/hour: <br />$107.96 <br />$126.84 <br />$100.59 <br />$100.59 <br />$54.68 <br />$24.01 <br />Operating cost/hour: <br />$81.97 <br />$106.36 <br />$43.62 <br />$87.23 <br />$11.75 <br />$8.53 <br />%Utilization -riper: <br />NA <br />0 <br />50 <br />0 <br />NA <br />NA <br />Ripperown.cost/hour. <br />NA <br />$0.00 <br />$10.94 <br />$10.94 <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />$0.00 <br />$3.41 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operatorcost/hour: <br />$31.17 <br />$41.20 <br />$41.85 1 <br />$41.85 <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$221.10 <br />$274.40 <br />$189.46 <br />$229.67 <br />$95.33 <br />$53.94 <br />Numberof Units: <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$716.60 <br />Support: <br />$419.13 <br />Maint: <br />$149.27 <br />Total work team cost/hour: $1,285.00 <br />MATERIAL OUANTITIES <br />Initial volume: 1,830 CCY <br />Loosevolume: 2,059 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />TotalCost: $0.00 <br />HOURLY PRODUCTION <br />Swell factor: 1.125 <br />Truck Capacity: <br />TruckPavload (weight) Basis: <br />Material weight: 2,550 Pounds/L.CY <br />Description: Earth - Dry packed <br />Rated Payload: 122,520 Pounds <br />CntCES Cost Estimating Solware <br />