My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_PERMIT FILE - C1996084 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2018-01-11_PERMIT FILE - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:13:16 AM
Creation date
3/22/2018 7:06:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
1/11/2018
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck(LoaderWorksheet Cont'd Task# 010 <br />Payload Capacity: 48.05 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />35.00 <br />LCY <br />Heaped Volume: <br />46.50 <br />LCY <br />Average Volume: <br />40.75 <br />LCY <br />Adjusted Volume: <br />46.50 <br />LCY <br />Final Truck Volume Based on Numberof LoaderPasses: <br />Loading Tool Capac ity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />Job Effici <br />Net Correction: <br />39.38 <br />Bucket Size Class: NA <br />11.250 1 LCY (heaped) <br />0.875 1 Loose material- 1" and over (85 - 90%) 0.875 <br />30 <br />Site Altitude (ft.): 7100 feet <br />Source <br />Loading Tool Cycle Time: Numberof Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Bas is Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />n inn <br />Page 2 of3 <br />LCY <br />4 passes <br />Wheel and TrackL.oaders-UnadjustedBasicLoaderCycleTime (load,dunip, 0.600 mutes <br />maneuver): <br />Cycle Time Factors <br />0.700 <br />Factor min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high orless <br />0.010 <br />(Cat HB) <br />0.01 <br />TruckOwnership: <br />Common ownership oftrucks and loaders - <br />0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: -0.050 minutes <br />Adjusted Loader Cycle Time: 0.550 minutes <br />Net Load Time per Truck: 1.750 minutes <br />Truck Cvcle Time: <br />TruckExchange Time: 0.70 Minutes <br />Truck Load Time: 1.750 Minutes <br />Truck Maneuver and Dump 1.10 Minutes <br />Time: <br />Adjusted for s ite altitude: <br />0.700 <br />Minutes <br />Adjustedforsitealtitude: <br />1.750 <br />Minutes <br />Adjus ted for s ite altitude: <br />1.100 <br />Minutes <br />CMCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.