Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Retum)Time: <br />yenetration 5.0 <br />HaulRoute: <br />Task# 008 Page 3 of <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) Roll. Res <br />Total Res <br />Velocity Travel <br />Velocity <br />(Ft) <br />(%) <br />(%) <br />(fpm) Time <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />8100.00 <br />0.00 5.00 <br />5.00 <br />1741 4.837 <br />HaulTime: 4.837 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />177.70 LCY/Hour <br />(Ft) <br />2 Truck(s) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Adjusted multiple truck/loaderteamproduction: 355.39 <br />LCY/Hour <br />min <br />1 <br />8100.00 <br />0.00 <br />5.00 <br />5.00 <br />3405 <br />2.648 <br />Loading Toolunit <br />Production 964.29 <br />Truck Unit Production <br />214.09 <br />Optimal No. ofTrucks: 5 <br />JOB TIME AND COST <br />Return Time: 2.648 <br />minutes <br />Total Truck Cycle Time: 11.035 <br />minutes <br />LCY/Hour Adjusted forjob efficiency: <br />800.36 LCY/Hour <br />LCY/Hour Adjusted forjob efficiency: <br />177.70 LCY/Hour <br />Truck(s) Selected NumberofTtucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 355.39 <br />LCY/Hour <br />Adjustedsingle truck/loader team production: 355.39 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 355.39 <br />LCY/Hour <br />Fleet size: 1 Team(s) Totaljobtime: 3.07 Hours <br />Unit cost: $3.549 /LCY Totaljobcost: $3,873 <br />CIRCES Cost Estimating Solware <br />