Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Return) Time: <br />penetration 5.0 <br />HaulRoute: <br />Task # 007 Page 3 of <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Trave <br />N N (fpm) <br />(Ft) <br />(%) <br />N <br />(fpm) <br />Time <br />1 1000.00 <br />8.00 <br />5.00 13.00 1362 <br />0.778 <br />505.78 LCY/Hour Adjustedforjob efficiency: <br />mm <br />1 <br />1000.00 -8.00 <br />5.00 <br />-3.00 <br />3512 <br />0.343 <br />HaulTime <br />Return Route- <br />0.343 <br />minutes <br />Seg # HaulDistance <br />Grade (%) <br />Roll. Res Total Res Velocity <br />Travel <br />(Ft) <br />minutes <br />N N (fpm) <br />Time <br />Production <br />964.29 LCY/Hour Adjusted forjob efficiency: <br />min <br />1 1000.00 <br />8.00 <br />5.00 13.00 1362 <br />0.778 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Totaljobtime: 7.86 Hours <br />Unit cost: $1.620 /LCY Totaljobcost: $10,190 <br />CIRCES Cost Estimatmg Soifware <br />Return Time: 0.778 <br />minutes <br />Total Truck Cycle Time: 4.671 <br />minutes <br />Loading Toolunit <br />Production <br />964.29 LCY/Hour Adjusted forjob efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />505.78 LCY/Hour Adjustedforjob efficiency: <br />419.80 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourlytruckteamproduction: 839.60 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Totaljobtime: 7.86 Hours <br />Unit cost: $1.620 /LCY Totaljobcost: $10,190 <br />CIRCES Cost Estimatmg Soifware <br />