Laserfiche WebLink
COST SUMMARY WORK <br />Task description: C-1996-084 Permit Renewal No. 4 Reclamation Cost Estimate <br />Site: LorencitoCanyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Replace Live -Handled Topsoil to W-1 <br />DOZER <br />2 <br />4.33 <br />$2,085.00 <br />Task#: 000 State: Colorado <br />Replace TopsodfromUpslope to W-1 <br />DOZER <br />Abbreviation: <br />None <br />$2,078.00 <br />Date: 8/16/2017 County: Las Animas <br />Rep lace Live -Handled Topsoil toW-1 <br />DOZER <br />Filename: <br />C084-000 <br />$830.00 <br />User: CCW <br />Rep lac eTo so il from Up slope AreatoW-4 <br />DOZER <br />2 <br />1.92 <br />$922.00 <br />Agency or organization name: DRMS <br />Rep lace Live -Handled Topsoil toW-6 <br />DOZER <br />2 <br />1.54 <br />TASK LIST (DIRECT COSTS) <br />019 <br />Rep lace Top soil from U s lop eArea to W-6 <br />DOZER <br />2 <br />Task <br />$413.00 <br />Form <br />Fleet <br />Task <br />1 <br />1.11 <br />Description <br />Used <br />Size <br />Hours <br />Cost <br />001 <br />Grade Borrow Area <br />GRADER <br />1 <br />2.21 <br />$297.00 <br />002 <br />Rep lace Top soil from Sto ckp ile BA# 1 to Fill 7a <br />TRUCKI <br />1 <br />4.84 <br />$6,242.00 <br />003 <br />Rep lace Top soilfrom StockpileSSP#2 to Fill 9a <br />TRUCKI <br />1 <br />7.31 <br />$9,438.00 <br />004 <br />Replace Topsoil fromStocile SSP#3 to Fill 8 <br />TRUCKI <br />1 <br />13.00 <br />$16,788.00 <br />005 <br />Replace Topsoil firomStocileSSP#2toN-1 <br />TRUCKI <br />1 <br />8.17 <br />$10,553.00 <br />006 <br />Replace Topsoil fromStockpile BA#2 to C-1 <br />TRUCKI <br />1 <br />12.76 <br />$16,473.00 <br />007 <br />Replace Topsoil from Stockpile BA#1toC-2 <br />TRUCKI <br />1 <br />7.86 <br />$10,190.00 <br />008 <br />Replace To soilfromStoc ileBA#2toS-2 <br />TRUCKI <br />1 <br />3.07 <br />$3,873.00 <br />009 <br />Replace Topsoil from Stockpile BA#3 to S4 <br />TRUCKI <br />1 <br />3.33 <br />$5,057.00 <br />010 <br />Replace Top soil from Stockp ileBA#32toW-2 <br />TRUCKI <br />1 <br />10.58 <br />$16,066.00 <br />011 <br />Replace Topsoil from Stockpile BA#3 to W-3 <br />TRUCKI <br />1 <br />2.98 <br />$3,830.00 <br />012 <br />Replace Topsoil from Stockpile BA#3 to W-5 <br />TRUCKI <br />1 <br />10.74 <br />$16,301.00 <br />013 <br />Replace Topsoil from SA Stockpile to Service <br />DOZER <br />2 <br />0.23 <br />$115.00 <br />25.07 <br />Area <br />040 <br />PIu2 and SealDrill Hole and Monitoring Wells <br />BOREHOLE <br />1 <br />014 <br />Replace Live -Handled Topsoil to W-1 <br />DOZER <br />2 <br />4.33 <br />$2,085.00 <br />015 <br />Replace TopsodfromUpslope to W-1 <br />DOZER <br />2 <br />4.32 <br />$2,078.00 <br />016 <br />Rep lace Live -Handled Topsoil toW-1 <br />DOZER <br />2 <br />1.72 <br />$830.00 <br />017 <br />Rep lac eTo so il from Up slope AreatoW-4 <br />DOZER <br />2 <br />1.92 <br />$922.00 <br />018 <br />Rep lace Live -Handled Topsoil toW-6 <br />DOZER <br />2 <br />1.54 <br />$743.00 <br />019 <br />Rep lace Top soil from U s lop eArea to W-6 <br />DOZER <br />2 <br />0.86 <br />$413.00 <br />020 <br />Rep lac e Top so il from Sto ckp ile BA#3 toW-6 <br />TRUCKI <br />1 <br />1.11 <br />$1,690.00 <br />021 <br />Replace Live -Handled Topsoil to N-2 <br />DOZER <br />2 <br />11.55 <br />$5,717.00 <br />022 <br />Rep lace Top soil from U s lop eArea toN-2 <br />DOZER <br />2 <br />12.84 <br />$6,177.00 <br />023 <br />Rep lace Live -Handled Topsoil to S-3 <br />DOZER <br />2 <br />0.98 <br />$472.00 <br />024 <br />Rep lace Top soil fro mU s lop etoS-3 <br />DOZER <br />2 <br />0.53 <br />$254.00 <br />025 <br />Replace Topsoil from Stockpile BA#3 to S-3 <br />TRUCKI <br />1 <br />0.67 <br />$1,024.00 <br />026 <br />Rep lace Top soilfromStockpileSSP#2 toN-I <br />DOZER <br />2 <br />4.16 <br />$2,060.00 <br />027 <br />Replace Live -Handled Topsoil to E-2 <br />DOZER <br />2 <br />0.83 <br />$398.00 <br />028 <br />Rep lace Top so il fro m Up s lop e Area to E-2 <br />DOZER <br />2 <br />0.82 <br />$397.00 <br />029 <br />Replace Live -Handled Topsoil to E-3 <br />DOZER <br />2 <br />1.65 <br />$794.00 <br />030 <br />Rep lace Top soil fi7o m Sto ckp ile BA#3 to E-3 <br />TRUCKI <br />1 <br />1.27 <br />$1,920.00 <br />031 <br />Rep lac eTop soil from Upslop eArea toBA#1 <br />DOZER <br />2 <br />1.45 <br />$715.00 <br />032 <br />Rep lace Top soil fro mU s lop eArea to BA#2 <br />DOZER <br />2 <br />1.73 <br />$831.00 <br />033 <br />Rep lace Top soil fro mU s lop eArea to BA#3 <br />DOZER <br />2 <br />3.88 <br />$1,868.00 <br />034 <br />Remo ve Top s oil from Knob Ab ove Cut <br />DOZER <br />2 <br />25.07 <br />$12,064.00 <br />040 <br />PIu2 and SealDrill Hole and Monitoring Wells <br />BOREHOLE <br />1 <br />27.00 <br />$13,030.79 <br />050 <br />Bro adc as t Seedin g M ine Site <br />REVEGE <br />1 <br />126.00 <br />$189,921.00 <br />051 <br />H d seeding Steep Slopes at Mine Site <br />REVEGE <br />1 <br />16.00 <br />$62,804.00 <br />052 <br />Fertilize Mine Site During Year 2 <br />REVEGE <br />1 <br />1 84.00 <br />$19,288.00 <br />