My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_PERMIT FILE - C1996084 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2018-01-11_PERMIT FILE - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:13:16 AM
Creation date
3/22/2018 7:06:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
1/11/2018
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul & Returnl Time: <br />penetration 5.0 <br />HaulRoute: <br />Task# 006 Page of3 <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res Total Res Velocity <br />Travel <br />Travel <br />(Ft) <br />(Ft) <br />(%) (%) (fpm) <br />Time <br />N (fpm) <br />Time <br />Adjustedsingletruck/loaderteamproduction: 683.23 <br />LCY/Hour <br />min <br />1 <br />1200.00 <br />8.00 <br />5.00 13.00 678 <br />1.798 <br />HaulTime: 1.798 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />TotalRes Velocity <br />Travel <br />LCY/Hour Adjustedforjob efficiency: <br />(Ft) <br />Truck(s) Selected NumberofTrucks: <br />N <br />N (fpm) <br />Time <br />Adjustedsingletruck/loaderteamproduction: 683.23 <br />LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 683.23 <br />LEY/Hour <br />min <br />1 <br />1200.00 <br />-8.00 <br />5.00 <br />-3.00 3569 <br />0.392 <br />Loading Toolunit <br />Production 964.29 <br />TruckUnit Production <br />411.59 <br />Optimal No. ofTrucks: 2 <br />JOB TIME AND COST <br />Return Time: 0.392 <br />minutes <br />Total Truck Cycle Time: 5.740 <br />minutes <br />LCY/Hour Adjusted forjob efficiency: <br />800.36 LCY/Hour <br />LCY/Hour Adjustedforjob efficiency: <br />341.62 LCY/Hour <br />Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourlytruckteamproduction: 683.23 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 683.23 <br />LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 683.23 <br />LEY/Hour <br />Fleet size: 1 Team(s) Totaljobtime: 12.76 Hours <br />Unit cost: $1.889 /LCY Totaljobcost: $16,473 <br />C[RCES Cost Estimating Sotware <br />
The URL can be used to link to this page
Your browser does not support the video tag.