Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />Truck Travel (Haul& Return)Time: <br />penetration 5.0 <br />HaulRoute: <br />Task# 005 Page of <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Loading Toolunit <br />(Ft) <br />(%) <br />(%) (fpm) <br />Tu*ne <br />min <br />1 <br />min <br />1 <br />600.00 <br />17.00 <br />5.00 <br />22.00 1 359 <br />1.676 <br />HaulTime: 1.676 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.854 /L.CY <br />Totaljobtime: 8.17 Hours <br />Totaljob cost: $10,553 <br />CIRCES Cost Estimating Solware <br />Seg # <br />HaulDistance <br />(Ft) <br />Grade (%) <br />Roll. Res Total Res <br />(%) (%) <br />Velocity Travel <br />(fpm) Time <br />Loading Toolunit <br />Production <br />964.29 LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />min <br />1 <br />1 600.00 <br />1 -17.00 <br />5.00 1 -12.00 <br />1 1920 1 0.406 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.854 /L.CY <br />Totaljobtime: 8.17 Hours <br />Totaljob cost: $10,553 <br />CIRCES Cost Estimating Solware <br />Return Time: 0.406 <br />minutes <br />Total Truck Cycle Time: 5.632 <br />minutes <br />Loading Toolunit <br />Production <br />964.29 LCY/Hour Adjustedforjob efficiency: <br />800.36 LCY/Hour <br />TtuckUnit Production <br />419.48 LCY/Hour Adjusted forjob efficiency: <br />348.17 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 696.33 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 696.33 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 696.33 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.854 /L.CY <br />Totaljobtime: 8.17 Hours <br />Totaljob cost: $10,553 <br />CIRCES Cost Estimating Solware <br />