Laserfiche WebLink
Truck/Loader Worksheet Cont'd <br />TruckTravel(Haul& Return) Time: <br />yenetration 5.0 <br />HaulRoute: <br />Task # 003 Page 3 of <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Travel <br />(Ft) <br />(Ft) <br />N <br />N (fpm) <br />Time <br />(fpm) <br />Time <br />458.83 LCY/Hour Adjusted forjob efficiency: <br />min <br />1 <br />700.00 <br />11.00 <br />5.00 <br />16.00 1 526 1 <br />1.345 <br />HaulTime: 1.345 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />N <br />N <br />(fpm) <br />Time <br />458.83 LCY/Hour Adjusted forjob efficiency: <br />380.83 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />mm <br />1 <br />700.00 <br />-11.00 <br />5.00 <br />-6.00 <br />3512 <br />0.254 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.695 /LCY <br />Totaljobtime: 7.31 Hours <br />Totaljobcost: $9,438 <br />CIRCES Cost Estimating Sodware <br />Return Time: 0.254 <br />minutes <br />Total Truck Cycle Time: 5.149 <br />minutes <br />Loading Toolunit <br />Production <br />964.29 LCY/Hour Adjusted forjob efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />458.83 LCY/Hour Adjusted forjob efficiency: <br />380.83 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourlytruck teamproduction: 761.65 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 761.65 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 761.65 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.695 /LCY <br />Totaljobtime: 7.31 Hours <br />Totaljobcost: $9,438 <br />CIRCES Cost Estimating Sodware <br />