My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-08_HYDROLOGY - C1981008
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981008
>
2018-03-08_HYDROLOGY - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 7:31:39 AM
Creation date
3/22/2018 6:59:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
3/8/2018
Doc Name
CDPS/NPDES Permit
From
Colorado Department of Public Health and Environment
To
DRMS
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART <br />Page 20 of 47 <br />Permit No.: CO0000213 <br />i) Roofs and associated surfaces composed of galvanized materials that may be mobilized by stormwater (e.g., <br />roofs, ducts, heating/air conditioning equipment, gutters and downspouts). <br />ii. Inventory of materials <br />The inventory shall list materials that contribute, or have the potential to contribute, pollutants to stormwater, <br />including but not limited to the following: <br />a) The types of materials handled at the facility that may be exposed to precipitation or runoff and could result in <br />stormwater pollution. <br />b) The types of materials handled at the facility that may leak or spill, and be exposed to precipitation or runoff <br />and result in stormwater pollution. <br />c) A narrative description of any potential sources of pollutants from past activities, materials and spills that <br />could contribute pollutants to stormwater discharges, and the corresponding outfall(s) that would be affected <br />by such spills and leaks. The description shall include the method and location of any on-site storage or <br />disposal; and documentation of all significant spills and leaks of oil or toxic or hazardous pollutants that <br />occurred at exposed areas, or that drained to a stormwater conveyance, in the 3 years prior to the SWMP <br />preparation date. <br />iii. Assessment of potential pollutant sources <br />The assessment of potential pollutant sources shall provide a short narrative or tabulation describing the potential of a <br />pollutant to be present in stormwater discharges for each facility activity, equipment and material identified above. <br />The permittee shall update this narrative when data become available to verify the presence or absence of these <br />pollutants. <br />e. Description of Control Measures <br />L The permittee shall document the location and type of each non-structural and structural control measure <br />implemented at the facility to achieve meet the effluent limitations contained in this permit. Documentation must <br />include those control measures implemented for stormwater run-on that commingles with any discharges covered <br />under this permit. <br />ii. Installation and implementation specifications for each control measure used by the permittee to meet the <br />effluent limitations contained in this permit must be retained with the SWMP. <br />f. Additional Control Measure Requirements: The permittee shall document the schedules, procedures, and evaluation <br />results for the following subset of practice -based effluent limitations (see EFFLUENT LIMITATIONS AND MONITORING <br />REQUIREMENTS). <br />i. Good Housekeeping — A schedule for regular pickup and disposal of waste materials, along with routine inspections <br />for leaks and conditions of drums, tanks and containers. <br />ii. Maintenance — Preventative maintenance schedules for industrial equipment and systems; control measures; and <br />any back-up practices in place should a runoff event occur while a control measure is off-line. <br />iii. Spill Prevention and Response Procedures — Procedures for preventing, responding to, and reporting spills and <br />leaks. The permittee may reference other plans (e.g., a Spill Prevention Control and Countermeasure (SPCC) plan) <br />otherwise required by a permit for the facility, provided that a copy of the other plan is kept onsite with the <br />SWMP, and made available for review consistent with SWMP Requirements. <br />iv. Employee Training — A schedule for all types of training required by this permit, content of the training, and log of <br />the dates on which specific employees received training. <br />v. Non-Stormwater Discharges — Documentation of the stormwater conveyance system evaluation for the presence <br />of non-stormwater discharges not authorized in this permit, and the elimination of all unauthorized discharges. <br />Documentation of the evaluation must include: <br />
The URL can be used to link to this page
Your browser does not support the video tag.