My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-08_HYDROLOGY - C1981008
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981008
>
2018-03-08_HYDROLOGY - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 7:31:39 AM
Creation date
3/22/2018 6:59:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
3/8/2018
Doc Name
CDPS/NPDES Permit
From
Colorado Department of Public Health and Environment
To
DRMS
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART <br />Page 14 of 47 <br />Permit No.: CO0000213 <br />2) Move to a TRE by identifying the necessary control program or activity and proceed with elimination of <br />the toxicity so as to meet the WET effluent limit. <br />If toxicity spontaneously disappears in the midst of a TIE, the permittee shall notify the Division within 10 calendar <br />days of such disappearance. The Division may require the permittee to conduct accelerated testing to demonstrate <br />that no pattern of toxicity exists, or may amend the permit to require an increased frequency of WET testing for <br />some period of time. If no pattern of toxicity is demonstrated through the accelerated testing or the increased <br />monitoring frequency, the toxicity incident response will be closed and normal WET testing shall resume. <br />The control program developed during a TRE consists of the measures determined to be the most feasible to <br />eliminate WET. This may happen through the identification of the toxicant(s) and then a control program aimed <br />specifically at that toxicant(s) or through the identification of more general toxicant treatability processes. A control <br />program is to be developed and submitted to the Division within 180 calendar days of beginning a TRE. Status <br />reports on the TRE are to be provided to the Division at the 60 and 120 calendar day points of the TRE investigation. <br />If toxicity spontaneously disappears in the midst of a TRE, the permittee shall notify the Division within 10 calendar <br />days of such disappearance. The Division may require the permittee to conduct accelerated testing to demonstrate <br />that no pattern of toxicity exists, or may amend the permit to require an increased frequency for some period of <br />time. If no pattern of toxicity is demonstrated through the accelerated testing or the increased monitoring <br />frequency, the toxicity incident response will be closed and normal WET testing shall resume. <br />d. Toxicity Reopener <br />This permit may be reopened and modified to include additional or modified numerical permit limitations, new or <br />modified compliance response requirements, changes in the WET testing protocol, the addition of both acute and <br />chronic WET requirements, or any other conditions related to the control of toxicants. <br />E. COMPLIANCE SCHEDULE(S) <br />1. Activities to Meet Total Recoverable Iron, Dissolved Manganese, and Dissolved Selenium Final Limits - Outfall 013; <br />Activities to meet Total Recoverable Iron Final Limits - Outfalls 012 and 016. <br />In order to meet the limitations for total recoverable iron, Dissolved Manganese, and Dissolved Selenium, the following <br />schedule is included in the permit. <br />Code <br />Event <br />Description <br />Due Date <br />CSO10 <br />Status/Progress Report <br />Submit a report summarizing the progress in implementing <br />02/28/2017 <br />strategies such that compliance with the final limitations will be <br />attained <br />CS010 <br />Status/Progress Report <br />Submit a report summarizing the progress in implementing <br />02/28/2018 <br />strategies such that compliance with the final limitations will be <br />attained <br />CSO10 <br />Status/Progress Report <br />Submit a report summarizing the progress in implementing <br />02/28/2019 <br />strategies such that compliance with the final limitations will be <br />attained <br />Achieve Final <br />Achieve final compliance with limitations. <br />03/01/2020 <br />CS017 <br />Compliance With <br />Discharge Limits <br />
The URL can be used to link to this page
Your browser does not support the video tag.