Laserfiche WebLink
C) <br />RPM, Inc. <br />September 1, 2017 <br />Attn: Mr. Tim Cazier <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />Re: Canon Dolomite Quarry Annual Report, M1977-376 <br />Dear Mr. Cazier: <br />Enclosed are the annual report, annual fee and annual report map. <br />The only activity at the Canon Dolomite Quarry in 2017 was hauling from stockpiles. In 2018, <br />additional drilling and blasting will take place within the existing disturbance in order to make <br />material available for processing and sale. No reclamation will occur in the next report period due <br />to the proximity of active mining to the adjacent benches. <br />Respectfully, <br />Bruce Humphries <br />Regulatory Permits Management, Inc. <br />Cc: Andre Laroche <br />Encl: <br />Transit Mix Concrete Co. <br />444 E. Costilla St. <br />Colorado Springs, CO 80903 <br />Mr. Danny Tezak <br />Tezak Heavy Equipment Co. Inc. <br />205 Tunnel Dr. <br />Canon City, CO 81212 <br />Annual Report Map <br />