Laserfiche WebLink
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />No significant weed issues this year <br />Total acres <br />14. is adequate topsoil reserved for reclamation, based on your approved permit? YES NO <br />Total acres <br />If "talo", please explain: No soil was saved during pre -law mining. <br />backfilled: <br />0.0 <br />seeded w/ <br />0.1 <br />w/topsoil <br />NA <br />mulched w/ <br />known <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />/A <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />Straw <br />graded: <br />.01 <br />fertilized w/ <br />unknown <br />replacement <br />NA <br />rate (tonslac): <br />a vd fertilizer: <br />depth (in.): <br />2.0 t/a <br />Seed <br />Fertilizer <br />Mulch <br />application <br />Broadcast <br />application <br />Broadcast <br />application <br />T Hydro -Spray <br />method: <br />method: <br />method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />No significant weed issues this year <br />14. is adequate topsoil reserved for reclamation, based on your approved permit? YES NO <br />/A <br />If "talo", please explain: No soil was saved during pre -law mining. <br />Processing fines will be used for reveg., fines are of adequate volume for site rec. <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br />/A <br />If "NO" please explain: No topsoil piles on site, please see above. <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining pian and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO <br />/A <br />17. Are all hazardous materials stored within approved spill containment structures? YES NOD <br />18. is your financial warranty value sufficient to cover the cost to complete reclamation? NO NIA <br />19. is your basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring information annually? YES NO <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />No monitoring is required as part of the approved application. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7-12 and 14. UPDATED <br />MAP ATTACHED: e,� s <br />