Laserfiche WebLink
} <br /> o Transit Mix Concrete <br /> Co. <br /> Reclamation Quantities and Phasing <br /> Reclamation will occur contemporaneously as mining progresses and as areas become available for material placement and <br /> closure. Areas, estimated volumes of mined material and salvageable topsoil are shown on Table D-1 and Table D-2 in Exhibit D. <br /> Table E-1 Reclamation Areas by Affected Land Type <br /> Hi hwall Hi hwall Total Mining <br /> Pit Floor g g l Backfill Mining Plant ' Roads Topsoil 2 Fines Related Total <br /> (acres) Bench Slope Stockpile Area (acres) (acres) Stockpile Stockpile Area Area <br /> (acres) (acres) (acres) (acres) (acres) <br /> acres acres <br /> Phase 1 0 0 0 0 0 0 20.57 0 0 0 20.57 <br /> Phase II 0 1.78 2.20 0.00 3.97 0 0 0 0 0 3.97 <br /> Phase III 0 0 0 7.95 7.95 0 0 0.77 10.58 0 18.54 <br /> Phase IV 0 0 0 2.77 2.77 0 0 0 0 0 2.77 <br /> Phase V 0 6.72 8.31 13.65 28.68 0 0 0 0 0 28.68 <br /> Phase VI 28.41 3.98 4.92 47.99 85.29 12.35 16.65 3.88 3.40 59.17 164.60 <br /> Total 28.41 11.53 14.27 73.71 128.66 12.35 37.22 4.66 13.98 59.17 239.03 <br /> ' The highwall slopes will be reclaimed as rock outcroppings, and these areas will not be revegetated. <br /> 'There will be approximately 12.90 acres of highwall that are covered by fines stockpiles and reclaimed as vegetated slopes. <br /> 2 The plant and topsoil stockpiles are wholly within the total mining and topsoil stockpile areas, and the reclamation areas associated with the <br /> plant and topsoil stockpiles are included in these other areas. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20, 2018 E-4# <br />