My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - M2017049 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-20_PERMIT FILE - M2017049 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2021 3:43:28 AM
Creation date
3/20/2018 12:46:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/20/2018
Doc Name
Adequacy Review Response #2
From
Transit Mix Concrete
To
DRMS
Email Name
TC1
WHE
ERR
ECS
PSH
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> necessary information for surface mine planning. These data were used to estimate a"Fair Quality <br /> to Good Quality" RMR designation for the basement rock for mining bench stability evaluation. <br /> No additional mineralization was observed in Section 16. <br /> (g) Primary and Secondary Commodities <br /> The primary commodity produced onsite is crushed and screened granite and diabase. The <br /> screen plant will generate various rock gradations as required by product demand. All materials <br /> produced from the site will be processed at the site. Excess fines from the plant may be sold as <br /> fill material, and material not sold may be mixed to provide a base over the reclaimed surface <br /> prior to placing topsoil. <br /> (h) Incidental products <br /> No incidental products (surplus non-commodity) products will be produced and sold as part of <br /> the mining operation. <br /> (i) Explosives use and proof of surrounding stability <br /> Explosives will be required for mining activities at the Quarry. Transit Mix has designed the <br /> attached Blasting Plan in coordination with the blasting contractor. The plan demonstrates that <br /> off-site areas will not be adversely affected by blasting per Rule 6.5(4) of the Construction <br /> Materials Rules and Regulations. Transit Mix will also perform pre-blast surveys as discussed in <br /> the attached Pre-Blast Survey Plan. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20,2018 D-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.