My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-20_PERMIT FILE - M2017049 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-20_PERMIT FILE - M2017049 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2021 3:43:28 AM
Creation date
3/20/2018 12:46:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/20/2018
Doc Name
Adequacy Review Response #2
From
Transit Mix Concrete
To
DRMS
Email Name
TC1
WHE
ERR
ECS
PSH
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> Plant <br /> At the start of mining operations, a portable plant will be used to crush and screen the rock. The <br /> portable plant will use a jaw crusher, cone crushers, a scalping screen and up to two finish <br /> screens. Once the plant pad has been excavated within the Quarry footprint and the Quarry <br /> sufficiently developed, after approximately 4 years, the permanent plant will be located within the <br /> pit extents as shown on Figure C-4. The permanent plant will use a jaw crusher, two cone <br /> crushers, a scalping screen, and two finish screens, which will be similar in function, but larger <br /> than, the portable plant. A separate, smaller riprap plant consisting of a grizzly feeder and <br /> associated conveyor belts will also be included with the permanent plant facility. The permanent <br /> plant equipment will be electric powered with power supplied by the local electric utility, and the <br /> portable plant will be electric powered with power generated on site during the development <br /> period. The permanent plant components are listed below in Table D-5. Transit Mix has sized <br /> the equipment, but the manufacturer has not been selected; therefore, the manufacturer may <br /> change for some or all of the components. Similarly sized equipment will be used regardless of <br /> the manufacturer. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20,2018 D-14# <br />
The URL can be used to link to this page
Your browser does not support the video tag.