Laserfiche WebLink
W- - „ <br /> Al Transit Mix Concrete Co. <br /> boundaries will be surveyed and staked to ensure that mining and reclamation activities remain <br /> within the permitted boundaries. Transit Mix intends to use separate staking for the various <br /> boundaries. Perimeter signage at the permit boundary will face outwards to warn that there is an <br /> active mine inside the boundary. The affected lands boundary will also be marked with signage, <br /> but these signs will face inward to warn operators that they are not to cross the boundary line. <br /> The disturbance, pit crest, and 100-foot offset from the creek will be staked as limits of <br /> disturbance, and operators will be instructed not to travel or disturb beyond these stakes. <br /> 2 - CAT Loader 988K <br /> 4 - CAT Loader 980K <br /> 5 - CAT Haul Trucks 772G <br /> 2 - CAT Track Dozer D10T2 <br /> 1 - CAT Motor Grader 16M <br /> 1 - CAT Backhoe 432F <br /> 2 - CAT Skid Steer 246D <br /> 1 - CAT Excavator 329E L <br /> 1 - Sandvik Drill DP1500i <br /> 1 - Kenworth Water Truck T880 <br /> 1 - Cat Telehandler TL943C <br /> 1 - Kenworth Lube Truck T300 <br /> Initial grubbing and clearing, along with the removal and stockpiling of topsoil will occur on the <br /> newly affected areas as mining progresses. The United States Department of Agriculture Natural <br /> Resources Conservation Service (NRCS) soil resources data were used to determine depth of <br /> topsoil to be salvaged and stockpiled for use in reclaiming affected areas of the project. Refer to <br /> Exhibit I. These data suggest the average topsoil thickness is less than six inches in the project <br /> area. Following construction of erosion control measures, topsoil, assumed to be six inches deep, <br /> will be removed from affected areas and stockpiled for later use during reclamation. <br /> Table D-1 shows the expected salvageable topsoil by mining phases. Phase I includes the <br /> salvageable topsoil from the development of the roads, stockpile areas, the Phase I mining area, <br /> and plant area. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 20,2018 D-5 <br />