Laserfiche WebLink
Table 3 <br /> Ready Mixed Concrete Company-Morton Lakes Mine and Holton Lakes Mine <br /> Replacement Supplies and Water Balance <br /> (all values in acre-feet,negative values are depletions,positive values are accretions) <br /> Out-of- City of Aurora Maximum Net Cumulative <br /> Priority Lease Water Transit River River <br /> Month Depletions Delivery Loss Balance Balance <br /> 1] [21 4 5 <br /> Mar-18 -9.2 11.4 -0.7 1.5 115.2 <br /> Apr-18 -11.1 15.1 -1.9 2.1 117.3 <br /> May-18 -12.9 17.6 -2.2 2.4 119.8 <br /> Jun-18 -16.7 21.0 -2.6 1.6 121.4 <br /> Jul-18 -18.9 22.0 -2.8 0.4 121.8 <br /> Aug-18 -18.4 21.1 -2.6 0.1 121.9 <br /> Sep-18 -15.5 17.9 -2.2 0.2 122.1 <br /> Oct-18 -12.5 13.7 -0.9 0.3 122.4 <br /> Nov-18 -9.0 10.3 -0.6 0.6 123.0 <br /> Dec-18 1 -6.9 1 7.7 -0.5 1 0.3 123.3 <br /> Mar-Dec 2018 -131.0 1 157.6 1 -17.0 1 9.6 <br /> Shaded rows are projections. <br /> [1] Out-of-priority mining depletion,from Table 2,column 13. <br /> [2] City of Aurora lease water deliveries to the South Platte River on days with a downstream <br /> river call,as reported in the accounting for WDID 0802593. <br /> [3] District 2 South Platte River transit loss(0.5%per mile from April through September and <br /> 0.25%per mile from October through March)on the Aurora lease delivery.City of Aurora <br /> lease water deliveries will incur a maximum of 12.5%or 6.25%transit loss over the 25 river <br /> miles from the Metro Hite WWTP to Big Dry Creek. <br /> [4]Net river balance deficit(-)or surplus(+).Equal to[1]+[2]+[3]. <br /> [5] Cumulative river balance deficit(-)or surplus(+).Equal to previous[4]+[3]. <br /> BBA 3nznola <br /> tercunsultants BISHOP-BROGDEN ASSOCIATES. INC. <br />