My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-15_REPORT - C1981010
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2018-03-15_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 11:02:43 AM
Creation date
3/20/2018 10:27:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
3/15/2018
Doc Name
Annual Hydrology Report
From
Trapper Mining Inc
To
DRMS
Annual Report Year
2017
Email Name
RAR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 SURFACE WATER <br />Trapper Mine monitored one stream site and thirteen active NPDES discharge sites during <br />2017. The stream site Flume Gulch (S-1) was sampled during June and September 2017 to <br />characterize spring flows at this location. Flow was observed at NPDES sites 001, 002, 011, 020 <br />and 022 in 2017. Only site 002 had flow each month while sites 001 and 011 had flow all but three <br />of the months. Sites 020 and 022 had flow in only four and one times respectively during 2017. <br />Baseline stream site East Pyeatt (S3) is also NPDES site 011. Sites were monitored monthly <br />throughout the year. Sites NPDES 008, 009, 017, 018, 019, 021, 023 and 024 did not discharge <br />during 2017. Maps No. 2-1 through 2-3 show the locations of these surface -water sites. <br />4.1 SURFACE -WATER FLOW <br />The 2008-2017 flow data tabulated in Appendix C in Table C-1 represents instantaneous <br />measurements associated with NPDES water -quality sampling (see the attached CD in Appendix D <br />for all historical surface -water data). Recorded surface runoff was similar in 2017 to the 2016 flows <br />at the Trapper Mine even with the precipitation being above average. <br />Figures C-1 through C-3 present the instantaneous flows versus time for the Trapper NPDES <br />sites for 2017. There was flow during each of the monthly samples of 2017 at NPDES 001 except <br />for July through September samples. The high flow during sampling was only 90 and 287 gpm for <br />NPDES 001 and 002 respectively in 2017. Surface flow at NPDES 011 was observed during each <br />monthly sample, except for July through September with a peak of 132 gpm during the October <br />sampling (see Figure C-2). NPDES 020 had flow during four of the monthly measurements while <br />NPDES 022 had flow in October (see Figure C-3). <br />Trapper Mining Company 4-1 <br />2017 Annual Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.