Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Task# 000 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.426 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5548 <br />Adjustedunit 2,546.25 LCY/hr <br />production: <br />Adjustedfleet 2546.25 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.177/LCY <br />Total job time: 1.89 Hours <br />Totaljob cost: $854 <br />Page 14 of 40 <br />CIRCES Cost Estimating So$ware <br />