Laserfiche WebLink
TRAPPER MINING INC. <br />CRAIG, COLORADO <br />,I VA <br />HORSE GULCH FILL <br />QUARTERLY FILL CERTIFICATION <br />I, Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br />accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br />Horse Gulch Fill construction. This quarterly inspection was conducted on March 8, 2018. The <br />fill was inspected for stability, and no appearance of instability, structural weakness, or other <br />hazardous condition was observed during the inspection. Construction during this quarter has <br />been under my supervision, and to the best of my knowledge and belief, has been consistent <br />with the design approved by the Colorado Division of Reclamation, Mining, and Safety. <br />3-i-ZoiB <br />Date <br />:2 Z• <br />° 43864 c <br />