My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-14_PERMIT FILE - M2018011
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018011
>
2018-03-14_PERMIT FILE - M2018011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 1:56:34 PM
Creation date
3/14/2018 4:09:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018011
IBM Index Class Name
Permit File
Doc Date
3/14/2018
Doc Name Note
No fee inccluded!!
Doc Name
Application
From
Ames Construction
To
DRMS
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br /> control. The source of this supply will be the same as the project's <br /> water source along Weld County Road 47 <br /> (i) Groundwater/surface water occurrence or disturbance. <br /> Ground water should not be encountered during this operation. If <br /> ground water is found the excavation will move away from the water. <br /> Ground water will not be pumped or moved from the site. <br /> Contamination of surface stormwater runoff will be controlled by <br /> diverting the runoff around the disturbed areas. This will be <br /> accomplished by perimeter berms of compacted soil around the <br /> excavation area. <br /> (j) Existing water rights <br /> Water rights will not be affected or impacted by the proposed borrow <br /> operation. <br /> (k) Refuse and acid or toxic producing materials. <br /> There are no known refuse, acid or toxic producing materials in the <br /> area of the proposed borrow. If they are encountered, borrow <br /> operations will cease and the materials will be contained in <br /> accordance with applicable laws and regulations. <br /> (1) Measures to minimize disturbance to hydrologic balance, off-site <br /> damage and provide for a reclaimed area that has a stable configuration <br /> consistent with the proposed future land use. <br /> Hydrologic balance - The proposed borrow operation impacts on the <br /> hydrologic balance will be minimal — groundwater should not be <br /> encountered (therefore, no dewatering).The reclaimed site will have a <br /> pervious cover of corn stalk and straw mulch which will not impact <br /> the pervious nature of the underlying sandy soils. <br /> Off-site damage — The boundaries of the excavation area and haul <br /> road will be clearly marked to prevent off-site damage during the <br /> borrow activities. Through the use of perimeter berms to prevent <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.