Laserfiche WebLink
Exhibit C <br /> control. The source of this supply will be the same as the project's <br /> water source along Weld County Road 47 <br /> (i) Groundwater/surface water occurrence or disturbance. <br /> Ground water should not be encountered during this operation. If <br /> ground water is found the excavation will move away from the water. <br /> Ground water will not be pumped or moved from the site. <br /> Contamination of surface stormwater runoff will be controlled by <br /> diverting the runoff around the disturbed areas. This will be <br /> accomplished by perimeter berms of compacted soil around the <br /> excavation area. <br /> (j) Existing water rights <br /> Water rights will not be affected or impacted by the proposed borrow <br /> operation. <br /> (k) Refuse and acid or toxic producing materials. <br /> There are no known refuse, acid or toxic producing materials in the <br /> area of the proposed borrow. If they are encountered, borrow <br /> operations will cease and the materials will be contained in <br /> accordance with applicable laws and regulations. <br /> (1) Measures to minimize disturbance to hydrologic balance, off-site <br /> damage and provide for a reclaimed area that has a stable configuration <br /> consistent with the proposed future land use. <br /> Hydrologic balance - The proposed borrow operation impacts on the <br /> hydrologic balance will be minimal — groundwater should not be <br /> encountered (therefore, no dewatering).The reclaimed site will have a <br /> pervious cover of corn stalk and straw mulch which will not impact <br /> the pervious nature of the underlying sandy soils. <br /> Off-site damage — The boundaries of the excavation area and haul <br /> road will be clearly marked to prevent off-site damage during the <br /> borrow activities. Through the use of perimeter berms to prevent <br /> Page 3 of 4 <br />